Engine compartment
Today I completed the heater hoses, with the exception of two jubilee clips that I need to get. The hoses were not long enough, so I had to add short lengths into the hose runs.
|
Heater hoses in place, less two jubilee clips |
Next the air temperature sensor was fitted to the air intake duct (the stainless steel tube). This required a grommet that would take a 12 mm sensor. I found that warming the grommet up in hot water helped with this.
|
Sensor fitted through grommet |
Then the brake and clutch lines were coupled up to the junction point on the bulkhead. The male parts of the hose were coated with a small amount of Loctite 572. The hoses will need securing with a tie wrap or similar at a later date. The Loctite was also applied to the connections on the inner wing.
|
Brake and clutch hoses connected |
Gear lever
The gear lever hole was enlarged a little to make sure that all gears could be selected. The escutcheon was used to mark out where the gear lever gator would go. I needed to keep well within this area.
I also taped up the loom run with racing tape in the passenger compartment. Not sure that I needed to do this, but it looked tidier prior to doing the carpets.
|
Gear lever hole enlarged and loom taped |
No comments:
Post a Comment